THE OAKS AT WHITAKER GLEN – RUBBER FLOORING INSTALLATION
Location
Raleigh, North Carolina
- Approximate; Area: ± 1,600 sq.ft
- Duration: 2 days
- Area: Fitness Room
SCOPE OF WORK
- Demolition of existing LVT flooring.
- Glue removal using a scarifier and hand scrapers.
- Removal of a previous patch layer that contained adhesive residue from an earlier preparation.
- Application of a complete skim coat across the entire area for leveling and consistency.
- Sanding of the skim coat to eliminate imperfections and ensure a smooth finish.
- Rubber flooring installation with precise seams and clean alignment.
- Final cleaning and delivery of the area ready for use.
RESULT
- Completed a durable and precise rubber flooring installation in the fitness room within two days.
- Transformed a previously uneven, adhesive-coated surface into a clean, level, and functional area for daily activity.